Reduce build time and components in a medium scale facility without compromise to quality
A medium scale manufacturer of heaters supplying both the domestic and commercial markets were experiencing difficulties with increasing costs of time and materials required during assembly of each heating unit. The time required to assemble a unit seemed to increase with growing sales.
After meeting with the owner and managing director of the company, we proposed a five-day information gathering session to evaluate the build process for the most commonly sold units.
During the five-day information-gathering period, we also evaluated the component construction drawings and bill of materials for the three highest selling units.
Each time there was an order for a unit the manufacturer was ordering components from multiple AutoCAD drawings that had multiple untracked revisions. Each unit also had multiple forms of fastenings such as clip fittings, screws, nuts, bolts and press fittings. In addition to this, the laser cut components which arrived were still attached to the sheet from which they were cut from (for ease of delivery and to reduce damage to components).
Fig. 1 - Example of heating units being assembled.
The most time consuming items in assembly consisted of the following (from longest to shortest):
After the evaluation session, the project proposal was broken down into two different sections:
Altered build design with template drawings and bill of materials to order and assemble from
Using a 3D design package, the existing heater assemblies (for the three highest selling units) were modelled and evaluated. After many modifications, using the software and only two pilot runs the following was achieved:
Altered workshop layout with reduced tooling
Once the new designs were trialed and ready to be incorporated as the standard, the following workshop changes were made:
View Our Services
Project Management, MEP Contractor Support, Project Management Consultancy, Manufacturing Consulting, Design Consultancy, Procurement Consultants, Process Improvement Consultants, Mechanical Engineering Consultants, Commissioning Plan, Project Management Consultants Sydney, Engineering Consultancy Melbourne